Handling uncertainty (threats and opportunities) and making sure the work meets requirements: responses, expected value, cost of quality and the quality tools.
The rules
- Risk is uncertainty that matters: threats (negative) and opportunities (positive). Record them in the risk register with an owner.
- Qualitative analysis ranks risks by probability and impact. Quantitative analysis puts numbers on overall effect (EMV, decision trees, Monte Carlo simulation).
- Threat responses: avoid, transfer (insurance, contracts), mitigate, accept (active = contingency reserve), escalate. Opportunity responses: exploit, share, enhance, accept, escalate.
- Residual risk remains after a response; a secondary risk is created by a response. A workaround handles a risk that wasn't planned for.
- Cost of quality: conformance = prevention + appraisal; nonconformance = internal failure + external failure. Prevention is cheaper than inspection.
- Manage quality checks the process (audits); control quality inspects the deliverables. Quality is meeting requirements; grade is the category of features. Low grade can be fine; low quality never is.
Formulas
- Expected monetary value: Probability × impact (threats negative, opportunities positive)
Common traps
- Insurance transfers the financial impact; it doesn't remove the risk itself.
- Accepting a risk can still mean setting aside a contingency reserve (active acceptance).
- Inspection finds defects; it doesn't prevent them.
How it's tested
Naming the response strategy, computing EMV, classifying costs of quality and choosing between quality processes.
Practise it
The full lesson, worked examples and practice questions are in Tickmark, where every answer choice is explained.
Open the full lesson